craiyon logo

An aerial view of a modern data center complex with multiple buildings, a large circular substation, parking lots, and landscaped grounds.

An aerial view of a modern data center complex with multiple buildings, a large circular substation, parking lots, and landscaped grounds.

Create a master plan of a 240 MW hyperscale data centre, including the loading/unloading bay and chillers above the terrace, i.e., kept on the chiller platform; the GIS substation building; diesel generators; the HSD yard (underground fuel storage tank); the sewage treatment plant; the admin block; the security building; the waste collection yard (hazardous waste collection, biomedical waste collection, and organic waste collection); the smoking zone; parking (two-wheeler and four-wheeler for the visitor and employee parking); secure entry; and the patrolling pathway, etc. Mehr sehen