imagine a cutaway view of a multi storey building. Its floors are suspended between core columns at the center of the building and at supporting structure at the exterior wall. Draw a cutaway diagram to show what happens to it when the connections between the floors and the central core have been severed so the floors are only connected at one end at the exterior wall and are dropping at the center because they are no longer connected to tho core supports Voir plus