Image of elders welding a pipe joint

image of elders welding a pipe joint

elders fitted and tack welded forging joint onto the pipe. After tack welding was finished, the BF (Barge Foreman) was called to disconnect the rigging arrangements from OHC (Over Head Crane) that was connected to the forging joint in station 1.5. The next step was to move forward the joint on the gondola located in station 1 in order to move it within the reach of the Overhead Crane (OHC). The SMO was located at the beadstall control cabin in front of Station 1, waiting for the BF instructions Ver más